Fairlington Arbor Online
  • Home
  • Bulletin Board
  • need to know
    • Resident Handbook
    • Governing Documents
    • Trash & Recycling
    • Arbor Pool
  • About
  • Calendar
  • Committees
    • Landscape
  • Owners
    • Owners Only
    • Communications
  • Condo Fee
Outside Projects
                                                      Draft Under Construction
                                                                    (Return to Variance)

New patio deck or slab
 [ 1-2 ] or [ 1-4 ]
You may add a new deck of wood, brick pavers, natural stone or concrete. A plan must be submitted detailing the dimensions and any other features such as steps. The deck must be held at least six inches away from all fence posts including the gate opening. The deck must terminate at the gate unless a step or steps are required to exit to common area grade. 

New shed [ 1-2 ] or [ 1-4 ]
One storage shed may be installed in your patio. The shed must be no taller in height than the lowest portion of your patio fence.

Replace exterior windows [ 1-5 ]
If you are replacing any exterior windows please make sure you provide documentation that confirms that the new windows will be white in color, six over six pane patterns formed by grid bars approximately ¾ inches wide. In your submission, please make sure also to include the color and material of the new windows

Replace Exterior Doors
If you are replacing any exterior doors, in addition to the required documentation above, you must provide details in regards to the frame and trim that will be installed with the new door. The molding (trim) must be identical to the current round trim displayed on all doors (front and back) at the Arbor. You must also provide the color codes that will be used t o paint the new doors. For your convenience, you can check the Arbor's door replacement policy on the Arbor's website or request a copy from the management office.


Replace Storm Doors [ 1-5 ] See Policy

New window in gable attic [ 1-8 ]

New kitchen vent [ 1-7 ]

Egress window in basement [ 1-8 ]

French doors in dining area [ 1-8 ]

Radon exhaust venting [ 1-7 ]

Handrail for front entrance steps [ 1-5 ]

​. If you are requesting to renovate common area landscaping, you must provide a drawing or sketch of the area which labels and identifies the locations and quantities of proposed plants, species of proposed plants, and sizes of each proposed new plant. You must also label and identify all existing plants, buildings, fences, utility boxes, and other common area elements.











The Arbor office is located at: 3472 S. Utah St. #A1, Arlington, VA 22206  (Enter through the back by the pool and tot lot)

  • Home
  • Bulletin Board
  • need to know
    • Resident Handbook
    • Governing Documents
    • Trash & Recycling
    • Arbor Pool
  • About
  • Calendar
  • Committees
    • Landscape
  • Owners
    • Owners Only
    • Communications
  • Condo Fee